Foundations & Footings
New-construction foundations and footings in {city} — poured walls, spread footings, and slab foundations engineered for Front Range soils and code.
What's included
- Review of structural drawings and soils report
- Footing and wall layout per engineered scope
- Rebar tied to schedule with embeds and dowels set
- Mix and cure protocols sized to Front Range temperatures
- Inspection coordination with the jurisdiction and builder
How we work
Foundation projects start with a review of the structural drawings, soils report, and site. The written proposal specifies the scope — footings, walls, slab, embeds, drainage — and a schedule that fits the builder's framing date. We coordinate the dig, place forms and rebar to the drawings, pour against a confirmed weather window, and hand off documented mix tickets, rebar inspection records, and cure logs.
Typical onboarding: site walk within 5 business days, written proposal within 7.